Whether your shaft is right
Two buildings at G+3 can need different machines if one has 1500 mm of pit and the other has 400 mm. The survey settles it, free.
Each extra stop is not another lift. It is one landing door assembly, roughly three metres more of both guide rails, a landing panel, longer travelling cable, and two to three more crew days. That is why the per-stop figure sits between Rs 0.70 L on a goods lift and Rs 2.60 L on a car elevator, and why it is published rather than negotiated.
| Product | G+1 | G+2 | G+3 | Per extra stop |
|---|---|---|---|---|
| Passenger MRL 408 kg | 7.43 | 8.28 | 9.13 | 0.85 |
| Passenger MR 544 kg | 8.15 | 9.05 | 9.95 | 0.90 |
| Hospital 1020 kg | 9.85 | 11.10 | 12.35 | 1.25 |
| Goods 1000 kg | 6.15 | 6.85 | 7.55 | 0.70 |
| Structure 408 kg | 10.35 | 11.80 | 13.25 | 1.45 |
| Hydraulic 272 kg | 8.95 | 9.70 | 10.45 | 0.75 |
| Car elevator 3000 kg | 16.90 | 19.50 | 22.10 | 2.60 |
Figures in Rs lakhs, GST excluded. Home lifts are a from-price of Rs 8,20,000 and are not laddered here, because the drive type moves the number more than the extra landing does.
G+4 and above we quote individually, for two honest reasons. Speed class often steps up above four floors, and hydraulic stops being economical past fifteen metres.
Why the per-stop figure is not flat
A stop is not just more travel. Each one adds a landing door and frame, an interlock, a landing panel and position indicator, more rope or hose, more guide rail and more trunking, plus the labour to align and test all of it.
That is why the per-stop figure scales with the machine rather than staying flat. On a goods lift it is about Rs 70,000. On a car elevator, where a landing entrance is nearly three metres wide, it is Rs 2,60,000.
Where the ladder stops
Beyond four floors the machine itself starts to change. Rope specification, counterweight, controller and sometimes the drive all move together, and a published per-stop figure would stop being honest.
The same is true of the home lift, which is why it has a from-price rather than a ladder. A home lift almost always goes into a house that is already built, and the building decides the drive type before the floor count gets a say.
Reading the ladder
Two buildings at G+3 can need different machines if one has 1500 mm of pit and the other has 400 mm. The survey settles it, free.
The shaft, the pit and the machine room are your contractor's number, not ours. We give you the drawings and the loads so you can get it priced properly.
Fifteen trips a day and three hundred trips a day are rated differently. Underrating a lift to win a quotation is why lifts fail early.
Get the exact figure
Tell us the floor count and what has to move, and we will send the figure for your building rather than a range.
Would rather talk? Call +91 93159 68348 or message us on WhatsApp.